BUILT FOR CUSTOM FURNITURE

Every piece is a prototype. Every quote is a guess.

Custom furniture shops do not lose on the craft. They lose in the fifteen handoffs between sketch and install. Every update lives in a different inbox. Every mistake is discovered too late.

4%
Avg custom fab margin
3 days
To price one custom job
5-10
Calls to price one sheet
1
Estimator holding it all
HOW A PROJECT RUNS TODAY

Seven steps. Every one leaks a little more.

This is the process we saw in every custom furniture shop we visited. It works because the designer holds it together in their head.

01
Client sends a photo and a rough dimension
A picture from Pinterest, a rough sketch, and a text saying "can you make this for my living room?" You are expected to price it anyway.
02
The designer opens the spreadsheet
The one they built fifteen years ago. Board feet, hardware, finish costs, quirks. Nobody else can read it. It works because they hold it in their head.
03
Pricing runs for two days
Every dimension. Every joint. Every finish. All of it priced against last quarter's lumber rates and this year's labor reality.
04
The quote goes out
Priced against standard yields that do not match the custom grain matching. Priced without the access conditions. Priced without the coordination cost. Priced on hope.
05
You win the job
The client says yes. Then the shop floor starts asking questions the quote did not answer.
06
The shop changes something
A detail gets revised. A hardware substitution. Nobody tells the office. The designer finds out at the site visit.
07
You eat the overrun
By closeout, you are 15% over budget. The design was perfect. The job still lost money. The designer goes back to the spreadsheet to figure out why.
"The shop floor sees the mistakes first, but their feedback almost never makes it back to the office. 80% of project chaos could be prevented if designers actually managed schedules instead of inboxes."
— A custom furniture shop owner, on the actual problem
WHERE THE MONEY LEAKS

Six leaks. Every one eats your margin.

These are not edge cases. They happen on every project. Nobody sees the bleeding until closeout.

1 designer
Who holds all the pricing knowledge

The pricing lives in one person's head.

Your best designer or shop manager has been there fifteen years. They know every material cost, every labor rate, every quirk of the finishing process. None of it is written down. It comes out through a spreadsheet only they can drive. When they leave, the entire pricing system walks out the door.

1 of 6
Steps in the actual project chain

The rendering was perfect. The job still lost money.

The design is step one. Then comes procurement, milling, assembly, finishing, and install. If step one does not connect to steps two through six, you have designed an island. The design is right. The job is not.

15–25%
Of material yield lost to bad estimating

You bid $2,000 under before the first cut.

You priced the wood based on a standard yield, but this piece requires book-matching the grain. That means buying 30% more lumber than you quoted. Compound that across every sheet of plywood and every board foot, and you have lost the job before it starts.

$4,500
Of finishing time missing from the bid

Client wanted a hand-rubbed oil finish.

The drawings were clean. The scope was clear. But nobody priced the 6 coats of oil, the sanding between each coat, and the 3-day cure time. The labor added up fast and it was not in the bid. You only find out when the finisher logs their hours.

10–30%
Of project value lost to coordination failures

The shop floor sees the mistake first. The office finds out last.

A hardware substitution is made and nobody tells the designer. A dimension gets tweaked on site and never makes it to the shop. By the time the office knows, the piece is already assembled. Rework starts on day one.

20–40 hrs
Per project on status reporting alone

The designer is managing emails, not building.

Every update comes from a different person in a different format. The designer spends the week chasing status instead of designing. The information exists — it just lives in twelve places at once.

WHY NOBODY BUILT FOR YOU

Because you were never the customer the VCs cared about.

Enterprise software companies chase the Fortune 500. Procore and Autodesk build for the biggest general contractors with teams of project engineers. The system is priced for them, designed for them, and refined for them.

A custom furniture shop is not that. You run 20 to 200 projects a year. Your designer is also the estimator. Your coordination happens in email, WhatsApp, and the shop floor. You do not have an IT department. You do not have a spare $50K for software that might not work.

So the enterprise tools skipped you. Estimating tools handled cut lists and stopped there. Project management tools assumed a clean workflow you do not have. Nothing connected the two.

We did not skip you. We started here.

WHY WE CARE

We watched a designer find out at install.

It happened on a custom walnut dining table we were shadowing. Twenty-two thousand dollars of custom furniture. The design was clean. The bid was competitive. The shop was on schedule.

Then the designer showed up at install. The specs had been revised two weeks earlier. Somebody in design changed a finish. The email went to one person. That person assumed somebody else had told the designer.

By the time the designer walked onto the site, the pieces were already built wrong. Rework started that afternoon. The $22K job lost $14K in two days. Nobody was at fault. The information just lived in too many places at once.

That is when we started building Intel. Not because we saw a market opportunity. Because we saw a furniture shop lose its margin to a coordination problem nobody had solved.

"Communication is not the problem. Accountability is."

— A furniture shop owner, on why projects fail
NOT ANOTHER TOOL

We are not asking your designers to learn anything.

Not an estimating replacement — your designer keeps their spreadsheet. Intel sits beside it.
Not a learning curve — Intel tracks four fields per project. Progress calculates itself.
Not a workflow change — your designer keeps running projects the way they always have.
Not a Procore clone — we do not do drawings, RFIs, or scheduling. We close the coordination gap.
Not a chatbot bolted onto a legacy product — Intel is AI-native from the ground up.
What everybody else does
Sell you an enterprise PM tool that assumes you have a project engineer team. Or an estimating tool that stops at cut lists. Neither one closes the loop between them.
What Intel does
Reads your scope. Builds the budget. Tracks every handoff. Turns every update into a record. When something changes, everybody knows at the same time. No more install-day surprises.
THE SOLUTION

Intel closes the loop between sketch and install.

Built specifically for project-driven businesses. Every stage has an owner, a gate, and evidence. Every exception has a name attached to it.

Reads your scope, tracks the drift

Intel reads the output of your estimate. When something changes — a spec, a material, a timeline — the change is versioned, priced, and routed to the people who need to know.

Every handoff has an owner

Client to designer. Designer to shop. Shop to finisher. Finisher to installer. Every stage has one person accountable. Nothing falls through because nothing is unassigned.

Exceptions created automatically

A delayed delivery. A spec change. A missed approval. Intel creates an exception the moment something goes off-plan, with the owner and the fix already identified.

Client-ready reports, generated automatically

Every plan, every update, every quality check — pulled into one document you can hand to a client. No more building the report the night before the walkthrough.

Explore Synlumex Intel
Live product. Free trial. 14 days.
REFERENCE NUMBERS

What the industry actually runs on.

Sourced from public industry benchmarks and the shops we interviewed.

4%
Avg custom fab margin
3 days
To price one custom job
10–30%
Project value lost to coordination
15–25%
Material yield drift
20–40 hrs
Per project on status reporting
1
Designer holding the system together
QUESTIONS

Everything you are probably thinking.

How is this different from estimating software?
Estimating software handles cut lists and takeoffs. Synlumex handles the actual scope — turning a photo or a rough sketch into manpower, materials, timeline, and a defensible budget range in minutes. The takeoff was never your problem. The 15% that disappeared between the sketch and the install was.
Do I need to replace my estimating spreadsheet?
No. Synlumex sits beside it. Your designer keeps their spreadsheet for the final cut list. Synlumex reads the scope, builds the budget, and tracks what happens next so the next quote is more accurate.
Will my craftsmen actually use it?
That was the bar. Synlumex tracks four fields per project. Nothing more. Progress calculates itself. Exceptions are created automatically. The designer stops chasing status and starts designing.
What about my installers?
Every stakeholder gets a simple view scoped to their work. Installers upload photos. Subs confirm deliveries. Nobody learns a complex interface. The record builds itself.
How does it handle change orders?
Every change is versioned, priced, and approved. The original bid, the change, and the final number are all linked. Disputes get resolved with a record, not an argument.
How is my data handled?
Encrypted in transit and at rest. Isolated at the database level. Never used to train foundational models. Every AI output is reviewable before it is actioned.
Can I try before paying?
Yes. 14-day trial. No card required. Run a real project through it and see how the coordination loop works.
What if I only run a handful of projects a year?
Synlumex is built for shops running real volume — where a 2% margin improvement is meaningful money. If you only build one piece every six months, you probably do not need software for it.

Your design is perfect. Do not let coordination eat the profit.

Talk to us. See how Intel closes the loop between your designer, your shop, and the install.

The product behind this page
Explore Synlumex Intel
WhatsApp usEmail us